HVAC System Solution Provider

Services

 
IN-HOUSE
DESIGN MANAGEMENT
Drawing work AutoCad
Design Calculation Load Calculations on Software.
    Selection of Fans & Cooling Coil.
PROJECT & QUALITY MANAGEMENT
MONITORING PROGRESS
For each project detailed activity bar chart is prepared. Based on site priorities, work flow sequence, time frame is provided for each work. Remedial measures are taken to control items behind schedule. Critical hold points are identified right in the beginning particularly in areas where interaction with order services are involved.
 
QUALITY CHECK LIST
We have our internal quality CHECK LISTS for various trades like ducting, piping, equipment installation etc. The site team follow these check list along with the approved drawings to inspect the work done.
METHOD STATEMENT- FOR HVAC WORK
 
DESIGN VALIDATION
Study of Customer need, design intent and application, system requirement & technical specifications
Visit to site. Collecting design inputs and drawings like architectural plans, reflecting ceiling plans, structural drawings and drawing related to utility areas
Calculations of cooling loads and air flow requirements for each control zone. Psychrometric analysis for critical areas, calculation of reheat figure, selections of apparatus dew points and finalizing air treatment process
Verification of systems pumping head, fan static pressure requirement, electrical load, water and air filtration need
Based on above, selection of equipments of desired rating as per technical specifications
Coordination with Architects and other utilities and preparation of shop and layout drawings
Preparation of air and water flow schematics, with necessary valves, strainers and control valves details and instrumentation input
Providing inputs for utilities / work to be provided by others out side battery limits
Obtaining consultants / architects approval and release of drawings for site work
Generation of material request as per approval and release if drawing for site work
Calculation of material as per purchase specification
PROCUREMENT
Based on the internal material request, placement of purchase order
Material chasing & follow up for delivery as per agreed schedule and bar chart
Coordinate for internal inspection at manufacturer’s works
Coordinate for vendor data and drawings
SITE EXECUTION
The team comprises of a project manager and an engineer at site assisted by supervisors and associates handling sheet metal ducting, thermal and acoustic insulation, piping, equipment installation, instrumentation and electrical work.

There are two separate teams. While the major ones handles physical site execution and other for dry run, commissioning and testing & balancing.
COMMISSIONING, TESTING & BALANCING
Inspection for physical completeness
Electrical work inspection including Megger test for panels, cables, motors & earthing continuity
Energizing of panels
Dry run to check for correct rotation
System commissioning
Air and water balancing
Validation of system for design parameters
Submission of handing over documents and as built drawings
INTERNAL QUALITY ASSURANCE
1. Compliance of Material Specification of bought out Items
  Verifications of test certificates
  Random inspection and verification with purchase specification
2. Inspection at site of Installed work
  Compliance of work with Approved drawings
  Check List to assure completeness
  To ensure coordination with other agencies
  Pressure testing of piping before insulation
3. Inspection before Commissioning
Physical verification of installation for correctness like
  Correct water piping connection
  Checking Phase sequence
  Correctness of alignment of Pumps
  Correctness of belt tension
  Correct rotation of Pumps
  Correct rotation of Fans
  No load current of motor
  etc.
4. Testing, Air and Water balancing
OUT SOURCING
DUCTING WORK
PIPING WORK
INSULATION WORK
ELECTRICAL WORK
 

contact us

Rehani House, A–109,
DDA Sheds, Okhla Phase – II,
New Delhi – 110020, INDIA
Bell : +91–11- 41323777
Telefax : +91-11- 41324678
Email : omi@riplhvac.in

clients